5/15/2023 0 Comments Road overpass![]() improves safety for drivers, pedestrians and cyclists.delivers an infrastructure need in the Local Plan.The level crossing will then be closed to all traffic, including pedestrians. Pedestrians can use the level crossing until the footbridge has been completed. The level crossing will be closed to vehicle traffic when the road bridge opens. ![]() a pedestrian footbridge with disabled access.the construction of a new road bridge over the railway line south of Ash Station.The scheme is still subject to final detailed design. The Gatwick to Reading route enhancements are already underway. Delays are likely to increase with the planned enhancement of passenger train services. This currently amounts to closure periods of up to 25 minutes per hour. The level crossing closes around eight times an hour or 150 times a day. The level crossing causes delays to vehicles, pedestrians and cyclists. The scheme will end the existing traffic congestion hotspot. There have been some recorded incidents of misuse by vehicles and pedestrians. Network Rail consider the level crossing as a medium-high risk. This involves preparing concept and functional designs for cycle paths over the Hampshire Road overpass and pedestrian crossings between Sunshine railway. It will remove the safety hazard posed by the present level crossing. Traffic currently use rural roads to avoid the level crossing. The scheme will encourage traffic off of rural roads. It will also reduce traffic congestion in the area. The closure will improve safety for local residents and users of Ash train station. The scheme will close Ash level crossing. It will enable housing that has been allocated in the Local Plan to come forward. ![]() It is part of the Council's Local Plan (Policy A31). Depending on funding availability, construction could potentially begin in 2028 and would take about two years.The Ash Road Bridge scheme is an important infrastructure project. It will also consider cost estimates and explore possible funding sources.Īdditionally, the City (working with its engineering consultant) will hold public meetings and collect input that will be considered in the project design.īuilding on the findings of this phase, the next phase would be detailed design, and would include additional public involvement. Phase 1 includes environmental and drainage studies, analysis of traffic and safety and a recommended plan for the project. This study is the first step in a multi-year, multi-phased project which will be completed in mid-2022. The South Carolina Department of Transportation (SCDOT) announces the closure of the Koon Road Bridge and segments of Koon Road and Western Lane for utility.
0 Comments
Leave a Reply. |